Civil engineering works; Input price index 2020=100

Civil engineering works; Input price index 2020=100

GWW Periods Input price indices (2020 =100)
42/43 Civil engineering works 2025 August 136.5
42/43 Civil engineering works 2025 September 136.1
42/43 Civil engineering works 2025 October 136.1
42/43 Civil engineering works 2025 November 136.4
42/43 Civil engineering works 2025 December 135.0
42/43 Civil engineering works 2026 January* 137.6
42/43 Civil engineering works 2026 February* 138.1
42/43 Civil engineering works 2026 March* 146.3
42/43 Civil engineering works 2026 April* 151.0
42/43 Civil engineering works 2026 May* 151.4
42/43 Civil engineering works 2026 June* 151.6
42/43 Civil engineering works 2026 July* 149.5
4211a Road construction; brick paving 2025 August 133.2
4211a Road construction; brick paving 2025 September 133.4
4211a Road construction; brick paving 2025 October 134.3
4211a Road construction; brick paving 2025 November 134.5
4211a Road construction; brick paving 2025 December 133.6
4211a Road construction; brick paving 2026 January* 134.7
4211a Road construction; brick paving 2026 February* 135.5
4211a Road construction; brick paving 2026 March* 138.8
4211a Road construction; brick paving 2026 April* 140.3
4211a Road construction; brick paving 2026 May* 140.3
4211a Road construction; brick paving 2026 June* 139.6
4211a Road construction; brick paving 2026 July* 140.1
4211b Road construction; asphalt paving 2025 August 137.4
4211b Road construction; asphalt paving 2025 September 134.2
4211b Road construction; asphalt paving 2025 October 132.7
4211b Road construction; asphalt paving 2025 November 133.0
4211b Road construction; asphalt paving 2025 December 129.1
4211b Road construction; asphalt paving 2026 January* 128.7
4211b Road construction; asphalt paving 2026 February* 128.1
4211b Road construction; asphalt paving 2026 March* 154.9
4211b Road construction; asphalt paving 2026 April* 168.7
4211b Road construction; asphalt paving 2026 May* 167.7
4211b Road construction; asphalt paving 2026 June* 171.2
4211b Road construction; asphalt paving 2026 July* 157.5
4212 Above and underground railways 2025 August 129.5
4212 Above and underground railways 2025 September 130.0
4212 Above and underground railways 2025 October 131.0
4212 Above and underground railways 2025 November 131.6
4212 Above and underground railways 2025 December 132.4
4212 Above and underground railways 2026 January* 136.1
4212 Above and underground railways 2026 February* 135.5
4212 Above and underground railways 2026 March* 136.0
4212 Above and underground railways 2026 April* 137.7
4212 Above and underground railways 2026 May* 138.9
4212 Above and underground railways 2026 June* 138.8
4212 Above and underground railways 2026 July* 139.0
4212a Railways; Construction 2025 August 127.3
4212a Railways; Construction 2025 September 127.2
4212a Railways; Construction 2025 October 127.8
4212a Railways; Construction 2025 November 128.1
4212a Railways; Construction 2025 December 128.0
4212a Railways; Construction 2026 January* 130.6
4212a Railways; Construction 2026 February* 131.0
4212a Railways; Construction 2026 March* 132.4
4212a Railways; Construction 2026 April* 133.3
4212a Railways; Construction 2026 May* 133.6
4212a Railways; Construction 2026 June* 133.7
4212a Railways; Construction 2026 July* 134.5
4212a.11 Rail infrastructure 2025 August 127.8
4212a.11 Rail infrastructure 2025 September 127.6
4212a.11 Rail infrastructure 2025 October 128.4
4212a.11 Rail infrastructure 2025 November 128.6
4212a.11 Rail infrastructure 2025 December 128.4
4212a.11 Rail infrastructure 2026 January* 131.3
4212a.11 Rail infrastructure 2026 February* 131.7
4212a.11 Rail infrastructure 2026 March* 133.6
4212a.11 Rail infrastructure 2026 April* 134.6
4212a.11 Rail infrastructure 2026 May* 135.0
4212a.11 Rail infrastructure 2026 June* 135.1
4212a.11 Rail infrastructure 2026 July* 135.5
4212a.11.01 Track construction/ground. 2025 August 137.9
4212a.11.01 Track construction/ground. 2025 September 137.2
4212a.11.01 Track construction/ground. 2025 October 138.1
4212a.11.01 Track construction/ground. 2025 November 138.4
4212a.11.01 Track construction/ground. 2025 December 137.1
4212a.11.01 Track construction/ground. 2026 January* 140.1
4212a.11.01 Track construction/ground. 2026 February* 140.7
4212a.11.01 Track construction/ground. 2026 March* 143.2
4212a.11.01 Track construction/ground. 2026 April* 146.2
4212a.11.01 Track construction/ground. 2026 May* 146.4
4212a.11.01 Track construction/ground. 2026 June* 145.6
4212a.11.01 Track construction/ground. 2026 July* 145.6
4212a.11.02 civil engineering 2025 August 127.3
4212a.11.02 civil engineering 2025 September 127.3
4212a.11.02 civil engineering 2025 October 128.0
4212a.11.02 civil engineering 2025 November 128.1
4212a.11.02 civil engineering 2025 December 128.1
4212a.11.02 civil engineering 2026 January* 130.3
4212a.11.02 civil engineering 2026 February* 130.6
4212a.11.02 civil engineering 2026 March* 132.3
4212a.11.02 civil engineering 2026 April* 133.2
4212a.11.02 civil engineering 2026 May* 133.5
4212a.11.02 civil engineering 2026 June* 133.9
4212a.11.02 civil engineering 2026 July* 134.2
4212a.11.03 Superstructure - Trackwork 2025 August 126.7
4212a.11.03 Superstructure - Trackwork 2025 September 126.4
4212a.11.03 Superstructure - Trackwork 2025 October 126.4
4212a.11.03 Superstructure - Trackwork 2025 November 126.6
Source: CBS.
Explanation of symbols

Table explanation


This table shows the input price indices of the costs of labour, materials and equipment for civil engineering works (in Dutch: Grond-, weg- en waterbouw (GWW)). There are ten areas within civil engineering. These areas are based on the standard Classification Products to Activity. For each area a series is calculated based on the price developments of various cost components of which the product to be realised -in this case a civil engineering project- is constructed. The price index for the total of civil engineering is a weighted average of the ten areas. The published price indices of civil engineering are based on the average price level of the month in question. Changes in the overall costs and 'profit and risks' are not taken into account.
Changes compared with twelve months previously are also published for all indices.

Data available from:
The input price indices in this series are available from January 2020 on.

Status of the figures:
Index figures up to December 2025 are definite. Other index figures are provisional.
The period the price indices remain provisional depends on the moment that the collectively negotiated (Cao) wage rates for the construction industry are definite. This period can vary from 4 to about 16 months after the period under review.

Changes as of August 28th 2026:
The figures for the months May, June and July 2026 have been added. The figures for 2025 are now definite

Changes as of May 28th 2025:
Following an adjustment in the weights, the figures have been changed from 2020 onwards.

When will new figures be published?
Provisional figures for August till October 2026 will be published at the end of November 2026.

Description topics

Input price indices
An index is the ratio between the value of a variable in a given period and the value of that variable in a chosen fixed (reference) period.

In this table the variable is the price trends in civil engineering. This is a weighted average of price movements of the components wages, materials and equipment (tools and machinery).