Civil engineering works; Input price index 2020=100

Civil engineering works; Input price index 2020=100

GWW Periods Input price indices (2020 =100)
42/43 Civil engineering works 2024 November 135.8
42/43 Civil engineering works 2024 December 135.0
42/43 Civil engineering works 2025 January* 136.4
42/43 Civil engineering works 2025 February* 137.1
42/43 Civil engineering works 2025 March* 138.0
42/43 Civil engineering works 2025 April* 135.9
42/43 Civil engineering works 2025 May* 135.7
42/43 Civil engineering works 2025 June* 135.7
42/43 Civil engineering works 2025 July* 136.9
42/43 Civil engineering works 2025 August* 136.5
42/43 Civil engineering works 2025 September* 135.9
42/43 Civil engineering works 2025 October* 136.3
4211a Road construction; brick paving 2024 November 129.7
4211a Road construction; brick paving 2024 December 129.5
4211a Road construction; brick paving 2025 January* 130.7
4211a Road construction; brick paving 2025 February* 131.0
4211a Road construction; brick paving 2025 March* 131.7
4211a Road construction; brick paving 2025 April* 131.3
4211a Road construction; brick paving 2025 May* 132.1
4211a Road construction; brick paving 2025 June* 132.4
4211a Road construction; brick paving 2025 July* 133.5
4211a Road construction; brick paving 2025 August* 133.2
4211a Road construction; brick paving 2025 September* 133.4
4211a Road construction; brick paving 2025 October* 134.3
4211b Road construction; asphalt paving 2024 November 145.8
4211b Road construction; asphalt paving 2024 December 141.9
4211b Road construction; asphalt paving 2025 January* 143.2
4211b Road construction; asphalt paving 2025 February* 144.8
4211b Road construction; asphalt paving 2025 March* 145.3
4211b Road construction; asphalt paving 2025 April* 141.1
4211b Road construction; asphalt paving 2025 May* 137.0
4211b Road construction; asphalt paving 2025 June* 137.2
4211b Road construction; asphalt paving 2025 July* 139.4
4211b Road construction; asphalt paving 2025 August* 137.4
4211b Road construction; asphalt paving 2025 September* 134.2
4211b Road construction; asphalt paving 2025 October* 133.0
4212 Above and underground railways 2024 November 126.8
4212 Above and underground railways 2024 December 127.0
4212 Above and underground railways 2025 January* 128.6
4212 Above and underground railways 2025 February* 129.1
4212 Above and underground railways 2025 March* 129.4
4212 Above and underground railways 2025 April* 129.1
4212 Above and underground railways 2025 May* 129.3
4212 Above and underground railways 2025 June* 129.8
4212 Above and underground railways 2025 July* 129.8
4212 Above and underground railways 2025 August* 129.5
4212 Above and underground railways 2025 September* 129.8
4212 Above and underground railways 2025 October* 130.9
4212a Railways; Construction 2024 November 123.8
4212a Railways; Construction 2024 December 123.8
4212a Railways; Construction 2025 January* 124.9
4212a Railways; Construction 2025 February* 125.1
4212a Railways; Construction 2025 March* 125.8
4212a Railways; Construction 2025 April* 126.0
4212a Railways; Construction 2025 May* 126.9
4212a Railways; Construction 2025 June* 127.0
4212a Railways; Construction 2025 July* 127.4
4212a Railways; Construction 2025 August* 127.3
4212a Railways; Construction 2025 September* 127.1
4212a Railways; Construction 2025 October* 127.7
4212a.11 Rail infrastructure 2024 November 124.7
4212a.11 Rail infrastructure 2024 December 124.7
4212a.11 Rail infrastructure 2025 January* 125.5
4212a.11 Rail infrastructure 2025 February* 125.7
4212a.11 Rail infrastructure 2025 March* 126.6
4212a.11 Rail infrastructure 2025 April* 126.7
4212a.11 Rail infrastructure 2025 May* 127.8
4212a.11 Rail infrastructure 2025 June* 127.9
4212a.11 Rail infrastructure 2025 July* 127.9
4212a.11 Rail infrastructure 2025 August* 127.7
4212a.11 Rail infrastructure 2025 September* 127.5
4212a.11 Rail infrastructure 2025 October* 128.3
4212a.11.01 Track construction/ground. 2024 November 134.2
4212a.11.01 Track construction/ground. 2024 December 133.3
4212a.11.01 Track construction/ground. 2025 January* 134.7
4212a.11.01 Track construction/ground. 2025 February* 134.9
4212a.11.01 Track construction/ground. 2025 March* 135.7
4212a.11.01 Track construction/ground. 2025 April* 134.9
4212a.11.01 Track construction/ground. 2025 May* 136.2
4212a.11.01 Track construction/ground. 2025 June* 136.4
4212a.11.01 Track construction/ground. 2025 July* 137.6
4212a.11.01 Track construction/ground. 2025 August* 137.9
4212a.11.01 Track construction/ground. 2025 September* 137.2
4212a.11.01 Track construction/ground. 2025 October* 138.0
4212a.11.02 civil engineering 2024 November 124.2
4212a.11.02 civil engineering 2024 December 124.1
4212a.11.02 civil engineering 2025 January* 124.8
4212a.11.02 civil engineering 2025 February* 125.2
4212a.11.02 civil engineering 2025 March* 126.0
4212a.11.02 civil engineering 2025 April* 126.1
4212a.11.02 civil engineering 2025 May* 127.3
4212a.11.02 civil engineering 2025 June* 127.3
4212a.11.02 civil engineering 2025 July* 127.4
4212a.11.02 civil engineering 2025 August* 127.3
4212a.11.02 civil engineering 2025 September* 127.3
4212a.11.02 civil engineering 2025 October* 128.0
4212a.11.03 Superstructure - Trackwork 2024 November 124.7
4212a.11.03 Superstructure - Trackwork 2024 December 125.0
4212a.11.03 Superstructure - Trackwork 2025 January* 125.5
4212a.11.03 Superstructure - Trackwork 2025 February* 125.6
Source: CBS.
Explanation of symbols

Table explanation


This table shows the input price indices of the costs of labour, materials and equipment for civil engineering works (in Dutch: Grond-, weg- en waterbouw (GWW)). There are ten areas within civil engineering. These areas are based on the standard Classification Products to Activity. For each area a series is calculated based on the price developments of various cost components of which the product to be realised -in this case a civil engineering project- is constructed. The price index for the total of civil engineering is a weighted average of the ten areas. The published price indices of civil engineering are based on the average price level of the month in question. Changes in the overall costs and 'profit and risks' are not taken into account.
Changes compared with twelve months previously are also published for all indices.

Data available from:
The input price indices in this series are available from January 2020 on.

Status of the figures:
Index figures up to December 2024 are definite. Other index figures are provisional.
The period the price indices remain provisional depends on the moment that the collectively negotiated (Cao) wage rates for the construction industry are definite. This period can vary from 4 to about 16 months after the period under review.

Changes as of December 1st 2025:
The figures for the months August, September and October 2025 have been added.

Changes as of May 28th 2025:
Following an adjustment in the weights, the figures have been changed from 2020 onwards.

Changes as of February 3th 2025:
The digits after the decimal point were incorrect due to a mistake while building the table. This has now been corrected.

When will new figures be published?
Provisional figures for November, December 2025 and January 2026 will be published at the end of February 2026.

Description topics

Input price indices
An index is the ratio between the value of a variable in a given period and the value of that variable in a chosen fixed (reference) period.

In this table the variable is the price trends in civil engineering. This is a weighted average of price movements of the components wages, materials and equipment (tools and machinery).