Civil engineering works; input price index 2000 = 100, from 1979

Civil engineering works; input price index 2000 = 100, from 1979

Areas of civil engineering works Periods Input price index (2000=100) Changes compared with one year earlier (%)
42/43 Civil engineering works 2015 January 146.3 -2.7
42/43 Civil engineering works 2015 April 147.8 -1.3
42/43 Civil engineering works 2015 July 148.4 -1.1
42/43 Civil engineering works 2015 October 146.3 -2.5
4211a Road construction; brick paving 2015 January 131.5 -1.6
4211a Road construction; brick paving 2015 April 132.1 -0.9
4211a Road construction; brick paving 2015 July 133.0 -0.2
4211a Road construction; brick paving 2015 October 132.5 -0.7
4211b Road construction; asphalt paving 2015 January 161.7 -6.7
4211b Road construction; asphalt paving 2015 April 163.4 -5.5
4211b Road construction; asphalt paving 2015 July 164.4 -5.0
4211b Road construction; asphalt paving 2015 October 159.1 -7.5
4211c Road maintenance 2015 January
4211c Road maintenance 2015 April
4211c Road maintenance 2015 July
4211c Road maintenance 2015 October
4212 Railways and underground railway. 2015 January 154.6 1.5
4212 Railways and underground railway. 2015 April 156.8 3.5
4212 Railways and underground railway. 2015 July 157.3 3.6
4212 Railways and underground railway. 2015 October 156.6 2.2
4213 Bridges and tunnels; constructio. 2015 January 124.7 -1.3
4213 Bridges and tunnels; constructio. 2015 April 125.0 -0.5
4213 Bridges and tunnels; constructio. 2015 July 125.5 0.2
4213 Bridges and tunnels; constructio. 2015 October 124.7 -0.7
4221 Constructions and construction w. 2015 January 144.3 -0.5
4221 Constructions and construction w. 2015 April 144.7 0.3
4221 Constructions and construction w. 2015 July 145.5 0.6
4221 Constructions and construction w. 2015 October 144.9 -0.4
4291 Constructions and construction w. 2015 January 142.8 -5.9
4291 Constructions and construction w. 2015 April 144.6 -4.4
4291 Constructions and construction w. 2015 July 145.2 -4.1
4291 Constructions and construction w. 2015 October 142.3 -5.4
4312 Site preparation works 2015 January 140.3 -3.9
4312 Site preparation works 2015 April 141.4 -2.9
4312 Site preparation works 2015 July 141.8 -3.2
4312 Site preparation works 2015 October 139.9 -3.9
4321 Electrical installation works 2015 January 130.1 2.2
4321 Electrical installation works 2015 April 132.7 4.6
4321 Electrical installation works 2015 July 132.4 4.1
4321 Electrical installation works 2015 October 131.6 2.3
Source: CBS.
Explanation of symbols

Table explanation


The historical series 'Civil engineering; input price index 2000=100, since 1979' represents the trend of the costs of labour, material and equipment involved in projects in various areas of civil engineering (in Dutch: Grond-, Weg- en Waterbouw (GWW)) in the Netherlands. This series was created by linking independently calculated series from the past.
At this moment, there are eight areas within civil engineering. These areas are based on the standard Classification Products to Activity (CPA). There is also one area of which the observation has stopped. For each area a series is calculated based on the price developments of various cost components of which the product to be realised -in this case a civil engineering project- is constructed.. The price index for the total of civil engineering is a weighted average of the eight areas. The published price indices of civil engineering are based on the average price level of the month in question. Changes in the overall costs and 'profit and risks' are not taken into account. Changes in excise duties (such as that of diesel, used in civil engineering works, from 1/1/2013) are also not reflected in the price indices.
Changes compared with twelve months previously are also published for all indices.

Data available from:
The various series of price indices of Civil Engineering cover different periods. Some start in 1979, while others start at the shift to 2000=100. For each series, the period for which it contains figures is given below:
- Constructions for fluids: February 1979
- Road construction: February 1979
- Road maintenance: February 1979; discontinued from October 2004
- Site preparation works: February 1979
- Constructions and construction works for utility projects for fluids Januari 1979
- Civil engineering works: January 2000
- Bridges and tunnels: January 2000
- Railways and underground railways: January 2000
- Constructions for water projects: January 2000
- Electrical installation works: January 2000

Status of the figures:
Index figures up to December 2024 are definite. Other index figures are provisional. The period the price indices remain provisional depends on the moment that the collectively negotiated (CAO) wage rates for the construction industry are definite. This period can vary from 4 to about 16 months after the period under review.

Changes as of December 1st 2025:
The figures for August, September and October 2025 have been added.

Changes as of May 28th 2025:
Following an adjustment in the weights, the figures have been changed.

Changes as of February 28th 2025:
The figures for January 2025 are added to the table. Also all the individual months from January 2024 were added to the table. This is due to an updated method with the new base year 2020=100.

Changes as of March 3th 2025:
Figures were not put in the correct columns due to an error in the source file. This has now been corrected.

When will new figures be published?
Provisional figures for November, December 2025 and January 2026 will be published at the end of February 2026.

Description topics

Input price index
An input index is an index seen from the cost of the producer. The input price index of Civil Engineering Works reflects the weighted average of price movements of the components wages, materials and equipment (tools and machinery).
---
An index is the ratio between the value of a variable in a given period and the value of that variable in a chosen fixed (reference) period.
Changes compared with one year earlier
Year-on-year percentage change. The price index of a period is compared with the price index of the same period in the previous year.