Civil engineering works; input price index 2000 = 100, from 1979

Civil engineering works; input price index 2000 = 100, from 1979

Areas of civil engineering works Periods Input price index (2000=100) Changes compared with one year earlier (%)
42/43 Civil engineering works 2024 November 209.8
42/43 Civil engineering works 2024 December 208.6
42/43 Civil engineering works 2025 January* 210.7 2.1
42/43 Civil engineering works 2025 February* 211.8 2.1
42/43 Civil engineering works 2025 March* 213.2 2.9
42/43 Civil engineering works 2025 April* 209.9 0.9
42/43 Civil engineering works 2025 May* 209.6 0.7
42/43 Civil engineering works 2025 June* 209.6 1.1
42/43 Civil engineering works 2025 July* 211.5 0.2
42/43 Civil engineering works 2025 August* 210.9 -0.1
42/43 Civil engineering works 2025 September* 209.9 1.0
42/43 Civil engineering works 2025 October* 210.6 1.3
4211a Road construction; brick paving 2024 November 189.3
4211a Road construction; brick paving 2024 December 189.0
4211a Road construction; brick paving 2025 January* 190.9 2.5
4211a Road construction; brick paving 2025 February* 191.2 2.4
4211a Road construction; brick paving 2025 March* 192.3 2.7
4211a Road construction; brick paving 2025 April* 191.7 2.6
4211a Road construction; brick paving 2025 May* 192.9 3.6
4211a Road construction; brick paving 2025 June* 193.4 4.1
4211a Road construction; brick paving 2025 July* 195.0 3.1
4211a Road construction; brick paving 2025 August* 194.4 3.1
4211a Road construction; brick paving 2025 September* 194.8 3.8
4211a Road construction; brick paving 2025 October* 196.0 3.7
4211b Road construction; asphalt paving 2024 November 222.1
4211b Road construction; asphalt paving 2024 December 216.2
4211b Road construction; asphalt paving 2025 January* 218.1 0.7
4211b Road construction; asphalt paving 2025 February* 220.7 1.6
4211b Road construction; asphalt paving 2025 March* 221.4 1.0
4211b Road construction; asphalt paving 2025 April* 215.0 -2.3
4211b Road construction; asphalt paving 2025 May* 208.7 -6.5
4211b Road construction; asphalt paving 2025 June* 209.0 -5.3
4211b Road construction; asphalt paving 2025 July* 212.4 -5.8
4211b Road construction; asphalt paving 2025 August* 209.3 -7.3
4211b Road construction; asphalt paving 2025 September* 204.5 -5.8
4211b Road construction; asphalt paving 2025 October* 202.6 -4.1
4211c Road maintenance 2024 November
4211c Road maintenance 2024 December
4211c Road maintenance 2025 January*
4211c Road maintenance 2025 February*
4211c Road maintenance 2025 March*
4211c Road maintenance 2025 April*
4211c Road maintenance 2025 May*
4211c Road maintenance 2025 June*
4211c Road maintenance 2025 July*
4211c Road maintenance 2025 August*
4211c Road maintenance 2025 September*
4211c Road maintenance 2025 October*
4212 Railways and underground railway. 2024 November 210.9
4212 Railways and underground railway. 2024 December 211.2
4212 Railways and underground railway. 2025 January* 213.8 3.8
4212 Railways and underground railway. 2025 February* 214.7 4.2
4212 Railways and underground railway. 2025 March* 215.2 4.3
4212 Railways and underground railway. 2025 April* 214.6 3.4
4212 Railways and underground railway. 2025 May* 215.0 3.7
4212 Railways and underground railway. 2025 June* 215.8 3.4
4212 Railways and underground railway. 2025 July* 215.9 1.9
4212 Railways and underground railway. 2025 August* 215.3 2.3
4212 Railways and underground railway. 2025 September* 215.9 2.6
4212 Railways and underground railway. 2025 October* 217.7 3.9
4213 Bridges and tunnels; constructio. 2024 November 171.3
4213 Bridges and tunnels; constructio. 2024 December 171.4
4213 Bridges and tunnels; constructio. 2025 January* 172.8 2.1
4213 Bridges and tunnels; constructio. 2025 February* 173.3 2.5
4213 Bridges and tunnels; constructio. 2025 March* 174.2 2.8
4213 Bridges and tunnels; constructio. 2025 April* 174.3 3.1
4213 Bridges and tunnels; constructio. 2025 May* 175.2 4.2
4213 Bridges and tunnels; constructio. 2025 June* 175.8 4.1
4213 Bridges and tunnels; constructio. 2025 July* 175.6 2.1
4213 Bridges and tunnels; constructio. 2025 August* 175.7 2.1
4213 Bridges and tunnels; constructio. 2025 September* 175.1 2.2
4213 Bridges and tunnels; constructio. 2025 October* 176.3 3.1
4221 Constructions and construction w. 2024 November 218.5
4221 Constructions and construction w. 2024 December 218.7
4221 Constructions and construction w. 2025 January* 222.8 3.4
4221 Constructions and construction w. 2025 February* 222.7 1.7
4221 Constructions and construction w. 2025 March* 227.2 6.4
4221 Constructions and construction w. 2025 April* 220.0 1.5
4221 Constructions and construction w. 2025 May* 222.9 3.0
4221 Constructions and construction w. 2025 June* 221.0 2.5
4221 Constructions and construction w. 2025 July* 224.7 1.6
4221 Constructions and construction w. 2025 August* 225.9 1.0
4221 Constructions and construction w. 2025 September* 226.0 2.3
4221 Constructions and construction w. 2025 October* 227.0 2.1
4291 Constructions and construction w. 2024 November 223.5
4291 Constructions and construction w. 2024 December 222.7
4291 Constructions and construction w. 2025 January* 224.0 1.9
4291 Constructions and construction w. 2025 February* 225.8 2.5
4291 Constructions and construction w. 2025 March* 226.5 2.5
4291 Constructions and construction w. 2025 April* 224.0 1.3
4291 Constructions and construction w. 2025 May* 224.0 1.3
4291 Constructions and construction w. 2025 June* 224.2 1.8
4291 Constructions and construction w. 2025 July* 226.2 1.5
4291 Constructions and construction w. 2025 August* 226.0 1.8
4291 Constructions and construction w. 2025 September* 225.3 2.4
4291 Constructions and construction w. 2025 October* 226.2 2.1
4312 Site preparation works 2024 November 211.1
4312 Site preparation works 2024 December 210.7
4312 Site preparation works 2025 January* 212.4 1.4
4312 Site preparation works 2025 February* 213.7 1.0
Source: CBS.
Explanation of symbols

Table explanation


The historical series 'Civil engineering; input price index 2000=100, since 1979' represents the trend of the costs of labour, material and equipment involved in projects in various areas of civil engineering (in Dutch: Grond-, Weg- en Waterbouw (GWW)) in the Netherlands. This series was created by linking independently calculated series from the past.
At this moment, there are eight areas within civil engineering. These areas are based on the standard Classification Products to Activity (CPA). There is also one area of which the observation has stopped. For each area a series is calculated based on the price developments of various cost components of which the product to be realised -in this case a civil engineering project- is constructed.. The price index for the total of civil engineering is a weighted average of the eight areas. The published price indices of civil engineering are based on the average price level of the month in question. Changes in the overall costs and 'profit and risks' are not taken into account. Changes in excise duties (such as that of diesel, used in civil engineering works, from 1/1/2013) are also not reflected in the price indices.
Changes compared with twelve months previously are also published for all indices.

Data available from:
The various series of price indices of Civil Engineering cover different periods. Some start in 1979, while others start at the shift to 2000=100. For each series, the period for which it contains figures is given below:
- Constructions for fluids: February 1979
- Road construction: February 1979
- Road maintenance: February 1979; discontinued from October 2004
- Site preparation works: February 1979
- Constructions and construction works for utility projects for fluids Januari 1979
- Civil engineering works: January 2000
- Bridges and tunnels: January 2000
- Railways and underground railways: January 2000
- Constructions for water projects: January 2000
- Electrical installation works: January 2000

Status of the figures:
Index figures up to December 2024 are definite. Other index figures are provisional. The period the price indices remain provisional depends on the moment that the collectively negotiated (CAO) wage rates for the construction industry are definite. This period can vary from 4 to about 16 months after the period under review.

Changes as of December 1st 2025:
The figures for August, September and October 2025 have been added.

Changes as of May 28th 2025:
Following an adjustment in the weights, the figures have been changed.

Changes as of February 28th 2025:
The figures for January 2025 are added to the table. Also all the individual months from January 2024 were added to the table. This is due to an updated method with the new base year 2020=100.

Changes as of March 3th 2025:
Figures were not put in the correct columns due to an error in the source file. This has now been corrected.

When will new figures be published?
Provisional figures for November, December 2025 and January 2026 will be published at the end of February 2026.

Description topics

Input price index
An input index is an index seen from the cost of the producer. The input price index of Civil Engineering Works reflects the weighted average of price movements of the components wages, materials and equipment (tools and machinery).
---
An index is the ratio between the value of a variable in a given period and the value of that variable in a chosen fixed (reference) period.
Changes compared with one year earlier
Year-on-year percentage change. The price index of a period is compared with the price index of the same period in the previous year.