Price index civil engineering works, 2000 = 100
| Periods | Total civil engineering works Indices (2000=100) | Total civil engineering works Changes compared to 1 year previously (%) | Execution of hydraulic engineering works Indices (2000=100) | Execution of hydraulic engineering works Changes compared to 1 year previously (%) | Structural works (e.g. fly-over) Indices (2000=100) | Structural works (e.g. fly-over) Changes compared to 1 year previously (%) |
|---|---|---|---|---|---|---|
| 2010 January | 136 | 2.9 | 132 | 0.2 | 119 | -9.0 |
| 2010 April | 139 | 5.7 | 136 | 4.9 | 120 | -5.4 |
| 2010 July | 140 | 4.4 | 137 | 5.4 | 120 | -2.6 |
| 2010 October | 140 | 4.2 | 137 | 4.5 | 120 | -0.2 |
| Source: CBS. | ||||||
Table explanation
Price indices on the basis of 2000=100 and changes compared to
1 year previously regarding several areas of work
January 2000 - October 2010
Changed on April 04 2011.
Frequency: Discontinued.
1 year previously regarding several areas of work
January 2000 - October 2010
Changed on April 04 2011.
Frequency: Discontinued.
Description topics
- Total civil engineering works
- Indices
- The price index is a weighted average of the 7 mentioned series,
completed with the price movement of electronic supplies.
For the weights of these parts as a whole, figures from "Nationale
Rekeningen" (NR, National Accounts) regarding the year 2000 are used.
- Changes compared to 1 year previously
- The changes are calculated from the price indices on total civil works
compared to the same month one year previously.
- Execution of hydraulic engineering works
- Indices
- The price index is based on price developments of wages, building
materials and equipment essential to hydraulic engineering works.
- Changes compared to 1 year previously
- The changes are calculated from the price indices on execution of
hydraulic engineering works compared to the same month one year
previously.
- Structural works (e.g. fly-over)
- Indices
- The price index is based on price developments of wages, building
materials and equipment essential to structural works.
- Changes compared to 1 year previously
- The changes are calculated from the price indices on structural works
compared to the same month one year previously.