Price index civil engineering works

Table explanation

Index construction sewer systems and roads, mechanical excavation and
road maintenance (1995=100, 1979=100), changes index (1995=100)
1979 - 1997 (Feb, Aug), Jan.1998-Oct.2004
Changed on April 28 2005.
Frequency: Discontinued.

Description topics

Basis index figures 15 February 1995=100
In the period 1995-1997, price indices were only available for the months
February and August. From 1998, indices are available for the months
January, April, July and October.
Index figures
Constr. sewerage inside built-up areas
The price index is based on price developments of wages, building
materials and equipment essential to sewerage construction inside built-up
areas.
Mechanical excavation for road constr.
The price index is based on price developments of wages, building
materials and equipment essential to construction of flyovers.
Road maintenance
The price index is based on price developments of wages, building
materials and equipment essential to the maintenance of roads (partly
asphalt and partly concrete paving) outside built-up areas.
Basis index figures 15 February 1979=100
Until 1998, index figures were calculated twice a year, i.e. on
15 February and 15 August. From 1998, these index figures are no longer
available.
Mechanical excavation for road constr.
The price index is based on mechanical excavation for flyovers and
includes :
- excavation, transport and processing of silt-containing sand;
- delivery of sand;
- processing, thickening and profiling of sand.
Road construction
The price index is based on maintenance of asphalt and brick roads
and includes:
- breaking up and removing of current asphalt surfaces;
- breaking up and cleaning of current brick paving;
- profiling of new surfaces;
- removing of surplus soil;
- laying of new brick and asphalt paving.