| Periods | Basis index figures 15 February 1995=100 Index figures Constr. sewerage inside built-up areas (1995=100) | Basis index figures 15 February 1995=100 Index figures Mechanical excavation for road constr. (1995=100) | Basis index figures 15 February 1995=100 Index figures Road maintenance (1995=100) | Basis index figures 15 February 1979=100 Mechanical excavation for road constr. (1979=100) | Basis index figures 15 February 1979=100 Road construction (1979=100) |
|---|---|---|---|---|---|
| 2004 January | 127 | 122 | 123 | . | . |
| 2004 April | 128 | 122 | 124 | . | . |
| 2004 July | 129 | 123 | 126 | . | . |
| 2004 October | 130 | 123 | 127 | . | . |
| Source: CBS. | |||||
Table explanation
Index construction sewer systems and roads, mechanical excavation and
road maintenance (1995=100, 1979=100), changes index (1995=100)
1979 - 1997 (Feb, Aug), Jan.1998-Oct.2004
Changed on April 28 2005.
Frequency: Discontinued.
road maintenance (1995=100, 1979=100), changes index (1995=100)
1979 - 1997 (Feb, Aug), Jan.1998-Oct.2004
Changed on April 28 2005.
Frequency: Discontinued.
Description topics
- Basis index figures 15 February 1995=100
- In the period 1995-1997, price indices were only available for the months
February and August. From 1998, indices are available for the months
January, April, July and October.- Index figures
- Constr. sewerage inside built-up areas
- The price index is based on price developments of wages, building
materials and equipment essential to sewerage construction inside built-up
areas.
- Mechanical excavation for road constr.
- The price index is based on price developments of wages, building
materials and equipment essential to construction of flyovers.
- Road maintenance
- The price index is based on price developments of wages, building
materials and equipment essential to the maintenance of roads (partly
asphalt and partly concrete paving) outside built-up areas.
- Basis index figures 15 February 1979=100
- Until 1998, index figures were calculated twice a year, i.e. on
15 February and 15 August. From 1998, these index figures are no longer
available.- Mechanical excavation for road constr.
- The price index is based on mechanical excavation for flyovers and
includes :
- excavation, transport and processing of silt-containing sand;
- delivery of sand;
- processing, thickening and profiling of sand.
- Road construction
- The price index is based on maintenance of asphalt and brick roads
and includes:
- breaking up and removing of current asphalt surfaces;
- breaking up and cleaning of current brick paving;
- profiling of new surfaces;
- removing of surplus soil;
- laying of new brick and asphalt paving.