Electricity; production and means of production

Electricity; production and means of production

Sectors Combined Heat and Power (CHP) Installation types Periods Output Physical units Electricity output (MWh) Output Units of heat Electricity output (TJ) Installed capacity Electrical power (megawatt)
Central electricity production Total CHP and Eonly installations Total of installations 2022** 56,999,205 205,197 17,762
Central electricity production Total CHP and Eonly installations Internal combustion engines 2022**
Central electricity production Total CHP and Eonly installations Steam turbines 2022** 22,689,421 81,682 5,631
Central electricity production Total CHP and Eonly installations Combined cycle units 2022** 29,958,527 107,851 11,494
Central electricity production Total CHP and Eonly installations Gas turbines 2022** 194,944 702 125
Central electricity production Total CHP and Eonly installations Nuclear energy plant 2022** 4,156,313 14,963 512
Central electricity production Total CHP and Eonly installations Hydro power plant 2022**
Central electricity production Total CHP and Eonly installations Wind turbine 2022**
Central electricity production Total CHP and Eonly installations Solar cells 2022**
Central electricity production Total CHP and Eonly installations Other installation types 2022**
Central electricity production Combined Heat and Power (CHP) Total of installations 2022** 16,622,354 59,840 4,979
Central electricity production Combined Heat and Power (CHP) Internal combustion engines 2022**
Central electricity production Combined Heat and Power (CHP) Steam turbines 2022** 9,172,314 33,020 1,780
Central electricity production Combined Heat and Power (CHP) Combined cycle units 2022** 7,255,096 26,118 3,074
Central electricity production Combined Heat and Power (CHP) Gas turbines 2022** 194,944 702 125
Central electricity production Combined Heat and Power (CHP) Nuclear energy plant 2022**
Central electricity production Combined Heat and Power (CHP) Hydro power plant 2022**
Central electricity production Combined Heat and Power (CHP) Wind turbine 2022**
Central electricity production Combined Heat and Power (CHP) Solar cells 2022**
Central electricity production Combined Heat and Power (CHP) Other installation types 2022**
Central electricity production Eonly installations Total of installations 2022** 40,376,851 145,357 12,783
Central electricity production Eonly installations Internal combustion engines 2022**
Central electricity production Eonly installations Steam turbines 2022** 13,517,107 48,662 3,851
Central electricity production Eonly installations Combined cycle units 2022** 22,703,431 81,732 8,420
Central electricity production Eonly installations Gas turbines 2022**
Central electricity production Eonly installations Nuclear energy plant 2022** 4,156,313 14,963 512
Central electricity production Eonly installations Hydro power plant 2022**
Central electricity production Eonly installations Wind turbine 2022**
Central electricity production Eonly installations Solar cells 2022**
Central electricity production Eonly installations Other installation types 2022**
Decentral electricity production Total CHP and Eonly installations Total of installations 2022** 64,728,888 233,024 36,038
Decentral electricity production Total CHP and Eonly installations Internal combustion engines 2022** 9,292,277 33,452 3,350
Decentral electricity production Total CHP and Eonly installations Steam turbines 2022** 6,179,645 22,247 1,339
Decentral electricity production Total CHP and Eonly installations Combined cycle units 2022** 7,513,446 27,048 2,114
Decentral electricity production Total CHP and Eonly installations Gas turbines 2022** 3,025,634 10,892 793
Decentral electricity production Total CHP and Eonly installations Nuclear energy plant 2022**
Decentral electricity production Total CHP and Eonly installations Hydro power plant 2022** 49,998 180 38
Decentral electricity production Total CHP and Eonly installations Wind turbine 2022** 21,400,798 77,043 8,755
Decentral electricity production Total CHP and Eonly installations Solar cells 2022** 17,078,783 61,484 19,600
Decentral electricity production Total CHP and Eonly installations Other installation types 2022** 188,307 678 50
Decentral electricity production Combined Heat and Power (CHP) Total of installations 2022** 25,186,147 90,670 7,122
Decentral electricity production Combined Heat and Power (CHP) Internal combustion engines 2022** 9,276,606 33,396 3,342
Decentral electricity production Combined Heat and Power (CHP) Steam turbines 2022** 5,309,841 19,115 1,200
Decentral electricity production Combined Heat and Power (CHP) Combined cycle units 2022** 7,513,446 27,048 1,764
Decentral electricity production Combined Heat and Power (CHP) Gas turbines 2022** 3,025,634 10,892 793
Decentral electricity production Combined Heat and Power (CHP) Nuclear energy plant 2022**
Decentral electricity production Combined Heat and Power (CHP) Hydro power plant 2022**
Decentral electricity production Combined Heat and Power (CHP) Wind turbine 2022**
Decentral electricity production Combined Heat and Power (CHP) Solar cells 2022**
Decentral electricity production Combined Heat and Power (CHP) Other installation types 2022** 60,620 218 23
Decentral electricity production Eonly installations Total of installations 2022** 39,542,741 142,354 28,917
Decentral electricity production Eonly installations Internal combustion engines 2022** 15,671 56 8
Decentral electricity production Eonly installations Steam turbines 2022** 869,804 3,131 139
Decentral electricity production Eonly installations Combined cycle units 2022** 350
Decentral electricity production Eonly installations Gas turbines 2022**
Decentral electricity production Eonly installations Nuclear energy plant 2022**
Decentral electricity production Eonly installations Hydro power plant 2022** 49,998 180 38
Decentral electricity production Eonly installations Wind turbine 2022** 21,400,798 77,043 8,755
Decentral electricity production Eonly installations Solar cells 2022** 17,078,783 61,484 19,600
Decentral electricity production Eonly installations Other installation types 2022** 127,687 460 27
Health care and social work Total CHP and Eonly installations Total of installations 2022** 203,703 733 225
Health care and social work Total CHP and Eonly installations Internal combustion engines 2022** 143,207 516 38
Health care and social work Total CHP and Eonly installations Steam turbines 2022**
Health care and social work Total CHP and Eonly installations Combined cycle units 2022**
Health care and social work Total CHP and Eonly installations Gas turbines 2022**
Health care and social work Total CHP and Eonly installations Nuclear energy plant 2022**
Health care and social work Total CHP and Eonly installations Hydro power plant 2022**
Health care and social work Total CHP and Eonly installations Wind turbine 2022**
Health care and social work Total CHP and Eonly installations Solar cells 2022** 174
Health care and social work Total CHP and Eonly installations Other installation types 2022** 60,496 218 13
Health care and social work Combined Heat and Power (CHP) Total of installations 2022** 203,703 733 50
Health care and social work Combined Heat and Power (CHP) Internal combustion engines 2022** 143,207 516 38
Health care and social work Combined Heat and Power (CHP) Steam turbines 2022**
Health care and social work Combined Heat and Power (CHP) Combined cycle units 2022**
Health care and social work Combined Heat and Power (CHP) Gas turbines 2022**
Health care and social work Combined Heat and Power (CHP) Nuclear energy plant 2022**
Health care and social work Combined Heat and Power (CHP) Hydro power plant 2022**
Health care and social work Combined Heat and Power (CHP) Wind turbine 2022**
Health care and social work Combined Heat and Power (CHP) Solar cells 2022**
Health care and social work Combined Heat and Power (CHP) Other installation types 2022** 60,496 218 12
Health care and social work Eonly installations Total of installations 2022** 175
Health care and social work Eonly installations Internal combustion engines 2022**
Health care and social work Eonly installations Steam turbines 2022**
Health care and social work Eonly installations Combined cycle units 2022**
Health care and social work Eonly installations Gas turbines 2022**
Health care and social work Eonly installations Nuclear energy plant 2022**
Health care and social work Eonly installations Hydro power plant 2022**
Health care and social work Eonly installations Wind turbine 2022**
Health care and social work Eonly installations Solar cells 2022** 174
Health care and social work Eonly installations Other installation types 2022** 1
Source: CBS.
Explanation of symbols

Dataset is not available.


This table shows the production of electricity, the input of fuels, and the use of installations, in the Netherlands. Electricity is obtained by the transformation of fuels such as natural gas, hard coal and fuel oil; solar and wind energy; and the use of hydro power. The figures are on the production of electricity, the heat released, fuel input, renewable energy commodities and installed capacity, broken down by Combined Heat and Power (CHP) installations and Electricity only (Eonly) installations. Finally, a distinction is made between central and decentral production of electricity and heat, where decentral production is broken down by sector.

Data available:
From 1998 onwards.

Status of the figures:
Figures 1998-2021 are definite. The 2022 figures are revised provisional.

Changes as of the November 2023:
The figures for the years 2015-2020 have been revised. Figures for 2021 and 2022 have been updated.
The revisions relate to the introduction of an improved analysis method in 2022, which has been carried back to previous years. Furthermore, data from a limited number of companies have been revised based on new insights. The adjustments are generally small; the adjustment in the total production and use of the various energy carriers is less than 1 percent in all years.


When will new figures be published?
In November 2024 definite figures 2022 and revised provisional figures 2023 will be published.


Description topics

Output
The total amount of electricity and/or heat generated in the Netherlands from the input of fuels, nuclear energy, wind energy, solar energy and hydro power. This includes the own consumption of the power plants to produce the electricity.
Physical units
Cubic metres, litres, kilograms, kilowatt hours for measuring quantities of energy.
Electricity output
The total amount of electricity generated in the Netherlands from the input of fuels, renewable energy, nuclear energy and other energy commodities. This includes the own consumption of the power plants to produce the electricity.
Units of heat
For comparabiity and addability of energy commodities, the physical quantities of energy commodities can be converted into the heat or energetic unit Joule.

The following relations exists between physical units and units of heat:

1 million m3 of natural gas equals about 31.65 terajoule (TJ = 1 000 miljard Joule).
1 million kg of fuel oil equals about 42 TJ.
1 million kg of hard coal equals about 25 TJ.
1 million kilowatt hour of electricity (1 Watt equals 1 Joule per second) equals 3.6 TJ.
Electricity output
The total amount of electricity generated in the Netherlands from the input of fuels, renewable energy, nuclear energy and other energy commodities. This includes the own consumption of the power plants to produce the electricity.

The unit TeraJoule (TJ) is used. This equals 1,000,000,000,000 joules (10 to the power of 12).
Installed capacity
The amount of electricity or heat that can be generated, per unit of time, during normal operation of all available electricity and heat production installations based in the Netherlands.
Electrical power
The amount of electricity that can be generated, per unit of time, during normal operation of all available installations of electricity production. Refers to gross power generation, i.e. power used within the plant itself has not been taken into account.