Price index civil engineering works

Dataset is not available.

Index construction sewer systems and roads, mechanical excavation and
road maintenance (1995=100, 1979=100), changes index (1995=100)
1979 - 1997 (Feb, Aug), Jan.1998-Oct.2004
Changed on April 28 2005.
Frequency: Discontinued.

Description topics

Basis index figures 15 February 1995=100
In the period 1995-1997, price indices were only available for the months
February and August. From 1998, indices are available for the months
January, April, July and October.
Index figures
Constr. sewerage inside built-up areas
The price index is based on price developments of wages, building
materials and equipment essential to sewerage construction inside built-up
areas.
Road construction
Road construction with brick paving
The price index is based on price developments of wages, building
materials and equipment essential to road construction with brick paving.
Road construction with asphalt paving
The price index is based on price developments of wages, building
materials and equipment essential to road construction partly with
asphalt and partly with concrete paving.
Mechanical excavation for road constr.
The price index is based on price developments of wages, building
materials and equipment essential to construction of flyovers.
Road maintenance
The price index is based on price developments of wages, building
materials and equipment essential to the maintenance of roads (partly
asphalt and partly concrete paving) outside built-up areas.
Changes compared to 1 year previously
The changes reflect the increase in the price index of a particular month
compared to the same month one year previously calculated to one decimal.
Constr. sewerage inside built-up areas
The changes are calculated from the price indices on sewerage construction
inside built-up areas compared to the same month one year previously.
Road construction
Road construction with brick paving
The changes are calculated from the price indices on road construction
with brick paving compared to the same month one year previously.
Road construction with asphalt paving
The changes are calculated from the price indices on road construction
with asphalt/concrete paving compared to the same month one year
previously.
Mechanical excavation for road constr.
The changes are calculated from the price indices on mechanical excavation
for road construction compared to the same month one year previously.
Road maintenance
The changes are calculated from the price indices on the maintenance of
roads with asphalt/concrete paving outside built-up areas compared to the
same month one year previously.